Page B-6
Airframe Specific Installation Instructions (G900X Only) – G900X/G950 Installation and Maintenance Manual
Revision D
190-00719-00
Given that the stock instrument panel support ribs have been removed, it will be necessary to add some
form of additional stiffening to ensure excessive vibration does not occur and damage the G900X/G950
system rack. As shown in Figure B-5, support ribs have been created and riveted to the side of the
G900X/G950 system rack and forward face of the subpanel. In this example, the front of the
G900X/G950 is attached to instrument panel with #4 screws, resulting in a very rigid overall structure
attached securely at both front and rear.
Figure B-5. G900X/G950 System Rack with Replacement Support Ribs