![Fuji Electric ALPHA5 Smart Скачать руководство пользователя страница 469](http://html1.mh-extra.com/html/fuji-electric/alpha5-smart/alpha5-smart_user-manual_2341955469.webp)
CHAPTER 11 ABSOLUTE POSITION SYSTEM
Starting Up Procedure
11-5
11
11.3 Starting Up Procedure
Follow the procedure below to start up the absolute position system.
If the encoder cable is disconnected due to transportation or device changes, repeat the procedure
from step [4].
Install the battery.
Enter PA1_02.
Perform position preset.
Follow the description of section
11.2 to install the battery correctly.
Set PA1_02 (INC/ABS system) at 1 (ABS) or 2
(endless non-overflow ABS).
To make new parameters enabled, turn the power off
then on again.
An absolute data lost alarm (dL1) is caused when
the power is turned on first after the absolute
position system is established. Execute position
preset to remove the alarm.
Perform homing.
To establish the coordinate system of the absolute
position system, execute regular homing.
[1]
[2]
[3]
[4]
[5]
Execute regular operation.
[6]
After above steps [1] through [5] are finished, the absolute
position system is established. You can start regular
operation.
Turn the main power off then
on again.
dL1
Содержание ALPHA5 Smart
Страница 1: ...24C7 E 0016c FUJI SERVO SYSTEM ALPHA5 Smart USER S MANUAL...
Страница 2: ......
Страница 4: ...ii...
Страница 36: ...CHAPTER 0 INTRODUCTION 0 16 Combination between Servomotor and Servo Amplifier 0...
Страница 276: ...CHAPTER 4 PARAMETER 4 108 Output Terminal Function Setting Parameter 4...
Страница 368: ...CHAPTER 6 KEYPAD 6 56 Test Operation Mode 6...
Страница 392: ...CHAPTER 7 MAINTENANCE AND INSPECTION 7 24 Troubleshooting 7...
Страница 405: ...CHAPTER 8 SPECIFICATIONS Specifications of Servo Amplifier 8 13 8 8 2 2 Interface Specifications...
Страница 411: ...CHAPTER 8 SPECIFICATIONS Dimensions of Servo Amplifier 8 19 8 8 4 Dimensions of Servo Amplifier...
Страница 472: ...CHAPTER 11 ABSOLUTE POSITION SYSTEM 11 8 Calculation of Battery Life 11...
Страница 488: ...CHAPTER 12 POSITIONING DATA 12 16 Response Time 12...
Страница 592: ...CHAPTER 14 PC LOADER 14 48 Parameter Conversion Tool 14 1 2 3 4 6 7 8 9 10 11...
Страница 595: ...CHAPTER 15 APPENDIXES Main Circuit Block Diagram 15 3 15 15 2 Main Circuit Block Diagram Applicable model Frame1...
Страница 633: ...CHAPTER 15 APPENDIXES Product Warranty 15 41 15 15 9 Product Warranty...
Страница 634: ...CHAPTER 15 APPENDIXES 15 42 Service Network 15 15 10 Service Network...
Страница 635: ......