CHAPTER 3 OPERATION
3-4
Operation Check
3
3.3 Operation Check
3.3.1 Power On
Connect the commercial power supply and the servomotor to the servo amplifier.
For the wiring method, refer to "CHAPTER 2 WIRING."
Supplying commercial power
Operate MCCB/ELCB to supply power.
If necessary, insert an electromagnetic contactor in the upstream of the main power input so that
the power can be shut off at any time.
The following results indicate the correct state.
(1) The charge LED lights up in red.
(2) If the servo amplifier is in the factory shipment state, the display on the amplifier
shows the following.
If the charge LED does not light up
200 V is not supplied to the main power terminals (L1, L2 and L3). Check the source voltage.
Operation does not start with single-phase 100 V power supply. In case of three-phase 400 V, use
a transformer to drop to 200 V to supply. (400 V will cause the servo amplifier to be broken.)
If the display does not light up
200 V is not supplied to the main power terminals (L1, L2 and L3). Check the source voltage.
Operation does not start with signal-phase 100 V power supply. In case of three-phase 400 V, use
a transformer to drop to 200 V to supply. (400 V will damage the servo amplifier.)
Charge LED
Содержание ALPHA5 Smart
Страница 1: ...24C7 E 0016c FUJI SERVO SYSTEM ALPHA5 Smart USER S MANUAL...
Страница 2: ......
Страница 4: ...ii...
Страница 36: ...CHAPTER 0 INTRODUCTION 0 16 Combination between Servomotor and Servo Amplifier 0...
Страница 276: ...CHAPTER 4 PARAMETER 4 108 Output Terminal Function Setting Parameter 4...
Страница 368: ...CHAPTER 6 KEYPAD 6 56 Test Operation Mode 6...
Страница 392: ...CHAPTER 7 MAINTENANCE AND INSPECTION 7 24 Troubleshooting 7...
Страница 405: ...CHAPTER 8 SPECIFICATIONS Specifications of Servo Amplifier 8 13 8 8 2 2 Interface Specifications...
Страница 411: ...CHAPTER 8 SPECIFICATIONS Dimensions of Servo Amplifier 8 19 8 8 4 Dimensions of Servo Amplifier...
Страница 472: ...CHAPTER 11 ABSOLUTE POSITION SYSTEM 11 8 Calculation of Battery Life 11...
Страница 488: ...CHAPTER 12 POSITIONING DATA 12 16 Response Time 12...
Страница 592: ...CHAPTER 14 PC LOADER 14 48 Parameter Conversion Tool 14 1 2 3 4 6 7 8 9 10 11...
Страница 595: ...CHAPTER 15 APPENDIXES Main Circuit Block Diagram 15 3 15 15 2 Main Circuit Block Diagram Applicable model Frame1...
Страница 633: ...CHAPTER 15 APPENDIXES Product Warranty 15 41 15 15 9 Product Warranty...
Страница 634: ...CHAPTER 15 APPENDIXES 15 42 Service Network 15 15 10 Service Network...
Страница 635: ......