3 Commissioning
3.1 Take system bus into operation
Gateway XN-312-GW-CAN 06/16 MN050003-EN
www.eaton.eu
43
Figure 27:
Device operation with and without config check
Import the target configuration in the following cases:
•
Initial Commissioning
•
Replacement of a defective module
•
When there is a change in the I/O slice module layout in the system
block
The online and real-time functions featured by the XN300-Assist program
offer a wide range of options for displaying and diagnosing the system bus,
even without an active PLC
Section “3.5 XN300-Assist”, page 48.
3.1.1.2 Switching on when the target configuration is stored
If a target configuration is already stored on the gateway, DIP switch 9 can
be switched to the "ON" position while the gateway is being powered on.
The gateway will then check the connected modules when booting up. Oth-
erwise, the current actual configuration will be used to overwrite the previ-
ously stored target configuration
Section “3.3 LEDs on the device”, page
NOTICE
If the gateway is run with the config check function disabled,
only the modules up to the device that has dropped out will be
assigned an address and stored. It will not be possible to use
the remaining modules until the defective module is replaced
and the configuration is imported again.
Содержание XN-312-GW-CAN
Страница 1: ...Manual CANopen Gateway XN 312 GW CAN 06 16 MN050003 EN ...
Страница 4: ...II ...
Страница 14: ...10 Gateway XN 312 GW CAN 06 16 MN050003 EN www eaton com ...
Страница 374: ...9 What Happens If 370 Gateway XN 312 GW CAN 06 16 MN050003 EN www eaton eu ...
Страница 388: ...384 Gateway XN 312 GW CAN 06 16 MN050003 EN www eaton eu ...