PowerVault ML6000 Maintenance Guide
17
•
The
Robot
test evaluates the basic functionality of the library robotics assembly, including the
picker assembly and the Y-carriage assembly, the barcode scanner, and the calibration sensors.
Time required to complete the Robot test is approximately 5 minutes.
•
The
Frame
test assesses the control and expansion module configuration and alignment.
Time required to complete the Frame test is approximately 3 minutes per module.
•
The
I/E Station
test assesses the configuration and functionality of each I/E station.
Time required to compete the I/E Station test is approximately 3 minutes per I/E station.
•
The
Drives
test performs functional tests on the library tape drives.
Time required to complete the Drives test is approximately 15 minutes per drive.
•
The
Tour
moves a scratch data cartridge through all storage slots in the extreme library locations.
It also scans the topmost and bottommost slots in the library and performs get/put operations, using
non-scratch data cartridges.
Time required to complete the Tour is approximately 5 minutes per module.
Running the IVT
1
Log on to the library, using the operator panel, as an administrator or service user.
2
Ensure that no applications are accessing the library.
If a
Progress Screen
is open, wait until it closes before attempting to run the IVT.
3
Select
Tools > Library Tests
.
4
Select
Installation & Verification Tests
, and then select
Next
.
5
All IVT subtests are preselected by default. Clear the check box next to a subtest name to exclude that
test from this IVT run. Select
Apply
when you are ready to run the IVT.
6
The Robot, Drives and Tour subtests each require that you to provide a scratch data cartridge before
the test can begin. When you are prompted to do so, place a scratch data cartridge into the top I/E
station slot, and then select
Apply
. You must import the scratch data cartridge into the system partition.
A subtest will fail if a required resource is missing. A required resource could be a scratch data cartridge
or an empty drive with available matching media type.
The IVT starts by performing an inventory of the library. The inventory is recorded in the IVT log, along
with the test results.
To see the IVT results, select
Details
on the
Library Test Progress
screen. If the IVT is still running,
you will only see results for tests that have completed.
To cancel the current IVT run between subtests, select
Stop
on the
Library Test Progress
screen, The
last issued commands will complete before library control is returned.
7
Once the selected tests are complete, select
Next
.
8
You can choose to view the detailed IVT log or e-mail the detailed IVT log. Make your choice and select
Next
.
9
Select
Close
to return to the
Tools
menu.
Note
You must configure the library e-mail account using the Web client if you intend
to e-mail the IVT log after running the IVT. To configure the e-mail account,
select
Setup > Notifications > E-mail Configuration
. For further details, see
the online help or the
Dell PowerVault ML6000 Tape Library User’s Guide
.
Содержание PowerVault ML6000
Страница 1: ...w w w d e l l c o m s u p p o r t d e l l c o m MaintenanceGuide Dell PowerVault ML6000 ...
Страница 14: ...xiv Tables ...
Страница 18: ...xviii Figures ...
Страница 452: ...434 Troubleshooting the Tape Library ...
Страница 456: ...438 Library Drawings Library Rear View Figure 32 ML6020 Rear View ...
Страница 463: ...PowerVault ML6000 Maintenance Guide 445 Figure 42 Model 1 Picker Assembly Figure 43 Model 2 Picker Assembly ...
Страница 466: ...448 Library Drawings Figure 46 Model 1 Parking Tab Parked Figure 47 Model 2 Parking Tab Parked ...
Страница 467: ...PowerVault ML6000 Maintenance Guide 449 Library Control Blade LCB Figure 48 Library Control Blade ...
Страница 468: ...450 Library Drawings Power Supplies Figure 49 Power Supplies ...
Страница 475: ...PowerVault ML6000 Maintenance Guide 457 Rack mounted Library Figure 56 Rack mounted Library Front ...
Страница 477: ...PowerVault ML6000 Maintenance Guide 459 Figure 58 Electrical System 5U Library Control Module ...
Страница 478: ...460 Library Drawings Figure 59 LCB Functions ...
Страница 479: ...PowerVault ML6000 Maintenance Guide 461 ...
Страница 480: ...462 Library Drawings Figure 60 Accessor Control Block Figure 61 Door and Import Export Board DIEB ...
Страница 481: ...PowerVault ML6000 Maintenance Guide 463 Figure 62 Door and Display Block Figure 63 Power System Block ...
Страница 482: ...464 Library Drawings Figure 64 Fan Control Board ...
Страница 483: ...PowerVault ML6000 Maintenance Guide 465 Figure 65 Library Cables ...
Страница 484: ...466 Library Drawings Figure 66 Library System Grounding ...
Страница 485: ...PowerVault ML6000 Maintenance Guide 467 Figure 67 Library Power System ...
Страница 486: ...468 Library Drawings ...
Страница 494: ...476 Glossary Y axis Y position The vertical position of the library s robotic arm ...