226
Troubleshooting the Tape Library
T028
T028 - Secondary Key Server Failover
Description
GUI Description:
The library performed a successful communication failover
to the primary key server.
Explanation:
The key management feature of the library allows the user to
connect two key servers for redundancy. If communication to the secondary
server is interrupted, the library will automatically switch or failover to the
primary server. This RAS ticket will be generated to notify the user that
communication to the secondary key server failed and that the library
performed a successful failover to the primary key server.
Detection Scenarios
When the library detects that it can no longer communicate with the
secondary key server and automatically switches to the primary key server,
where it established successful communication.
Root Causes
• Secondary key server is not connected properly.
• Secondary key server is not configured properly.
• Library Ethernet settings are not configured properly.
Resolution
1 Perform
DR079 - Resolve Key Server Request Issue
on page 401.
2 Perform EKM Path Diagnostics (
Tools > Diagnostics > EKM > EKM Path
Diagnostics
in the Web client). See
Running EKM Path Diagnostics
on
page 8.
Possible CRUs/FRUs
None
Содержание PowerVault ML6000
Страница 1: ...w w w d e l l c o m s u p p o r t d e l l c o m MaintenanceGuide Dell PowerVault ML6000 ...
Страница 14: ...xiv Tables ...
Страница 18: ...xviii Figures ...
Страница 452: ...434 Troubleshooting the Tape Library ...
Страница 456: ...438 Library Drawings Library Rear View Figure 32 ML6020 Rear View ...
Страница 463: ...PowerVault ML6000 Maintenance Guide 445 Figure 42 Model 1 Picker Assembly Figure 43 Model 2 Picker Assembly ...
Страница 466: ...448 Library Drawings Figure 46 Model 1 Parking Tab Parked Figure 47 Model 2 Parking Tab Parked ...
Страница 467: ...PowerVault ML6000 Maintenance Guide 449 Library Control Blade LCB Figure 48 Library Control Blade ...
Страница 468: ...450 Library Drawings Power Supplies Figure 49 Power Supplies ...
Страница 475: ...PowerVault ML6000 Maintenance Guide 457 Rack mounted Library Figure 56 Rack mounted Library Front ...
Страница 477: ...PowerVault ML6000 Maintenance Guide 459 Figure 58 Electrical System 5U Library Control Module ...
Страница 478: ...460 Library Drawings Figure 59 LCB Functions ...
Страница 479: ...PowerVault ML6000 Maintenance Guide 461 ...
Страница 480: ...462 Library Drawings Figure 60 Accessor Control Block Figure 61 Door and Import Export Board DIEB ...
Страница 481: ...PowerVault ML6000 Maintenance Guide 463 Figure 62 Door and Display Block Figure 63 Power System Block ...
Страница 482: ...464 Library Drawings Figure 64 Fan Control Board ...
Страница 483: ...PowerVault ML6000 Maintenance Guide 465 Figure 65 Library Cables ...
Страница 484: ...466 Library Drawings Figure 66 Library System Grounding ...
Страница 485: ...PowerVault ML6000 Maintenance Guide 467 Figure 67 Library Power System ...
Страница 486: ...468 Library Drawings ...
Страница 494: ...476 Glossary Y axis Y position The vertical position of the library s robotic arm ...