PowerVault ML6000 Maintenance Guide
101
10
If required, install the tape blockers in the bottom two rows of the library configuration. The tape blockers
block slots in the bottom two rows of the library. You can insert the tape blockers through the open
access door.
Preparing to Use the 9U Expansion Module
1
Close the library’s I/E station and access doors.
2
Add the tape drives to the modules. For details, see
Adding, Removing, and Replacing Tape Drives
on
page 127.
3
Add the power supplies. For details, see
Adding, Removing, and Replacing Power Supplies
on page
106.
4
If your library contains FC I/O blades, install both the I/O blades and the accompanying fan blades in
the expansion module. For details, see
Adding, Removing, and Replacing FC I/O Blades
on page 130
and
Adding, Removing, and Replacing the FC I/O Fan Blade
on page 137.
5
Connect all power cords, network data cables, and module-to-module cables. Make sure the module
terminators are installed at the top and bottom of the stack of modules. For cabling instructions, see
Cabling the Library
on page 22.
6
Power on the library.
7
Re-create partitions, cleaning slots, and I/E station slots as desired.
CAUTION
Libraries that have a Model 2 robot installed no longer use tape blockers. If
your library contains a Model 2 robot, do NOT install tape blockers. For
more information, see
Removing and Replacing the Robot Assembly
on
page 164 and
How to Determine Which Robot Your Library Contains
on
page 165.
1
access door
2
tape blockers (installed)
1
2
Содержание PowerVault ML6000
Страница 1: ...w w w d e l l c o m s u p p o r t d e l l c o m MaintenanceGuide Dell PowerVault ML6000 ...
Страница 14: ...xiv Tables ...
Страница 18: ...xviii Figures ...
Страница 452: ...434 Troubleshooting the Tape Library ...
Страница 456: ...438 Library Drawings Library Rear View Figure 32 ML6020 Rear View ...
Страница 463: ...PowerVault ML6000 Maintenance Guide 445 Figure 42 Model 1 Picker Assembly Figure 43 Model 2 Picker Assembly ...
Страница 466: ...448 Library Drawings Figure 46 Model 1 Parking Tab Parked Figure 47 Model 2 Parking Tab Parked ...
Страница 467: ...PowerVault ML6000 Maintenance Guide 449 Library Control Blade LCB Figure 48 Library Control Blade ...
Страница 468: ...450 Library Drawings Power Supplies Figure 49 Power Supplies ...
Страница 475: ...PowerVault ML6000 Maintenance Guide 457 Rack mounted Library Figure 56 Rack mounted Library Front ...
Страница 477: ...PowerVault ML6000 Maintenance Guide 459 Figure 58 Electrical System 5U Library Control Module ...
Страница 478: ...460 Library Drawings Figure 59 LCB Functions ...
Страница 479: ...PowerVault ML6000 Maintenance Guide 461 ...
Страница 480: ...462 Library Drawings Figure 60 Accessor Control Block Figure 61 Door and Import Export Board DIEB ...
Страница 481: ...PowerVault ML6000 Maintenance Guide 463 Figure 62 Door and Display Block Figure 63 Power System Block ...
Страница 482: ...464 Library Drawings Figure 64 Fan Control Board ...
Страница 483: ...PowerVault ML6000 Maintenance Guide 465 Figure 65 Library Cables ...
Страница 484: ...466 Library Drawings Figure 66 Library System Grounding ...
Страница 485: ...PowerVault ML6000 Maintenance Guide 467 Figure 67 Library Power System ...
Страница 486: ...468 Library Drawings ...
Страница 494: ...476 Glossary Y axis Y position The vertical position of the library s robotic arm ...