PowerVault ML6000 Maintenance Guide
83
b. With your free hand, move the parking tab to the "unparked" position so that it is removed
completely from the interior of the module (
Model 1 parking tab:
swivel the parking tab away
from you;
Model 2 parking tab
: move in a clockwise direction). When replaced correctly, the
parking tab will not accidentally swivel into the path of the robot.
c. Gently release the robot assembly. It will lower to the bottom module of the library.
7
Close the library’s I/E station and access doors.
8
Connect all power cords, network data cables, and module-to-module cables. Make sure the module
terminators are installed at the top and bottom of the stack of modules. For cabling instructions, see
Cabling the Library
on page 22.
9
Power on the library.
10
Re-create and/or modify partitions, cleaning slots, and I/E station slots as desired.
11
Import tape cartridges to the correct library partitions as needed.
12
Save the library configuration (see
Saving the Configuration
on page 13).
13
If the host application inventories the location of each tape cartridge in the library, open the host
application and reinventory to sync its logical inventory with the physical inventory of the library. Due to
the way the library logically addresses its tape drives and slots internally (see
Understanding Logical
Element Addressing
on page 543), permanently removing an expansion module from the library will
change the element addresses, and this can affect proper communication to a controlling host. Because
of this, you must refresh the configuration of any backup application that manages the library to reflect
the adjusted positions. In addition, you may need to reboot the host server(s) or rescan the bus to detect
the changes.
Model 2 tab
Model 1 tab
Содержание PowerVault ML6000
Страница 1: ...w w w d e l l c o m s u p p o r t d e l l c o m MaintenanceGuide Dell PowerVault ML6000 ...
Страница 14: ...xiv Tables ...
Страница 18: ...xviii Figures ...
Страница 452: ...434 Troubleshooting the Tape Library ...
Страница 456: ...438 Library Drawings Library Rear View Figure 32 ML6020 Rear View ...
Страница 463: ...PowerVault ML6000 Maintenance Guide 445 Figure 42 Model 1 Picker Assembly Figure 43 Model 2 Picker Assembly ...
Страница 466: ...448 Library Drawings Figure 46 Model 1 Parking Tab Parked Figure 47 Model 2 Parking Tab Parked ...
Страница 467: ...PowerVault ML6000 Maintenance Guide 449 Library Control Blade LCB Figure 48 Library Control Blade ...
Страница 468: ...450 Library Drawings Power Supplies Figure 49 Power Supplies ...
Страница 475: ...PowerVault ML6000 Maintenance Guide 457 Rack mounted Library Figure 56 Rack mounted Library Front ...
Страница 477: ...PowerVault ML6000 Maintenance Guide 459 Figure 58 Electrical System 5U Library Control Module ...
Страница 478: ...460 Library Drawings Figure 59 LCB Functions ...
Страница 479: ...PowerVault ML6000 Maintenance Guide 461 ...
Страница 480: ...462 Library Drawings Figure 60 Accessor Control Block Figure 61 Door and Import Export Board DIEB ...
Страница 481: ...PowerVault ML6000 Maintenance Guide 463 Figure 62 Door and Display Block Figure 63 Power System Block ...
Страница 482: ...464 Library Drawings Figure 64 Fan Control Board ...
Страница 483: ...PowerVault ML6000 Maintenance Guide 465 Figure 65 Library Cables ...
Страница 484: ...466 Library Drawings Figure 66 Library System Grounding ...
Страница 485: ...PowerVault ML6000 Maintenance Guide 467 Figure 67 Library Power System ...
Страница 486: ...468 Library Drawings ...
Страница 494: ...476 Glossary Y axis Y position The vertical position of the library s robotic arm ...