
(200)7A-40
OVERHAUL MANUAL
1 -2 ACCUMULATOR
SPRING
Fig. 7A-1 5 8 A —I nsta 11 i ng 1-2 A c c u m u l a t o r S p rin g
FO R ID E N T IF IC A T IO N
Fig. 7A-1 5 9 A - T y p i c a l V alve B o d y S p a ce r Plate
Fig. 7A-1 6 0 A - ln s ta llin g 5th Check Ball
£
4. Install 5th check ball in case as shown (Fig. 7A-
160A).
5. Install 2 guide pins as shown in Fig. 7A-161A.
6. Install 4 check balls into ball seat pockets in control
valve assembly and retain with petrolatum . (See Fig. 7A-
162A for check ball location.)
7. Place the control valve assembly to spacer plate
gasket m arked "VB" on the control valve assembly.
8. Place the valve body spacer plate on the gasket
m arked "VB".
9. Place the spacer plate to case gasket m arked
"C"
on
the spacer plate.
10. Insert 2 control valve assembly to case attaching
bolts through the control valve assembly, gaskets and spacer
plate; and install these parts, aligning the manual valve with
the detent lever pin (Fig. 7A -161 A).
NOTE:
Make sure check balls, 1-2 accum ulator piston
and m anual valve do not fall out.
11. Start control valve assembly to case attaching bolts,
except the throttle lever and bracket assembly and the oil
screen attaching bolts.
CAUTION:
The (2) oil screen attaching bolts are
about 10mm (3/8") longer than the control valve
assembly attaching bolts, and they are not
interchangeable.
12. Inspect inside manual detent roller and spring
assembly for damage.
13. Remove guide pins and replace with bolts and
inside manual detent roller and spring assembly, locating
the tang in the control valve assembly, and the roller on the
inside detern lever (Fig. 7A-163A).
14. T hrottle lever and bracket assembly.
a. Inspect throttle lever and bracket assembly for
damage (Fig. 7A-164A).
b. If removed, install spring on top of lifter, then lifter
spring first into throttle bracket.
c. Install link on throttle lever making sure link is
hooked as shown (Fig. 7A-165A).
d. Install throttle lever and bracket assembly, locating
slot in bracket with coiled pin, aligning lifter through valve
body hole and link through T.V. linkage case bore. Retain
with bolt.
15. Torque all control valve assembly to case attaching
bolts to 13.0-17.0 N -m (9-12 ft. lbs.).
Fig. 7 A - 161 A —I nsta lling C o n tro l Valve A s s e m b ly Us in g Guide
Pins
4
5th CHECK B ALL
(T.V. EXHAUST)
Содержание 1977 10 Series
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 42: ......
Страница 65: ...STEERING 3B 23 Fig 3B 65 M easure Back and Remark Housing Fig 3B 67 Tighten Lock Nut...
Страница 86: ...4B 14 OVERHAUL MANUAL Fig 4B 28 Gear Teeth C ontact Pattern Check...
Страница 125: ...REAR AXLE DIFFERENTIAL 4B 53 Fig 18E Gear Teeth Contact Pattern Check...
Страница 156: ......
Страница 164: ...4C 8 OVERHAUL MANUAL Fig 4C 12 Gear Tooth Pattern Contact Pattern...
Страница 166: ......
Страница 194: ......
Страница 284: ......
Страница 320: ......
Страница 322: ...400 7A 2 OVERHAUL MANUAL Fig 7A 1C Side Cross Section Typical...
Страница 444: ...7B 64 OVERHAUL MANUAL Fig 7B 11S M od el 2 03 Transfer Case Exploded V iew...
Страница 458: ......
Страница 466: ......
Страница 467: ......
Страница 468: ......