![ABB REL670 2.2 IEC Скачать руководство пользователя страница 670](http://html.mh-extra.com/html/abb/rel670-2-2-iec/rel670-2-2-iec_applications-manual_4789670.webp)
15.4.3.1
Application
M13555-3 v8
The interlocking for bus-coupler bay (ABC_BC) function is used for a bus-coupler
bay connected to a double busbar arrangement according to figure
function can also be used for a single busbar arrangement with transfer busbar or
double busbar arrangement without transfer busbar.
QB1
QB2
QC1
QA1
WA1 (A)
WA2 (B)
WA7 (C)
QB7
QB20
QC2
en04000514.vsd
IEC04000514 V1 EN-US
Figure 326:
Switchyard layout ABC_BC
15.4.3.2
Configuration
M13553-138 v4
The signals from the other bays connected to the bus-coupler module ABC_BC are
described below.
15.4.3.3
Signals from all feeders
M13553-6 v4
To derive the signals:
Signal
BBTR_OP
No busbar transfer is in progress concerning this bus-coupler.
VP_BBTR
The switch status is valid for all apparatuses involved in the busbar transfer.
EXDU_12
No transmission error from any bay connected to the WA1/WA2 busbars.
These signals from each line bay (ABC_LINE), each transformer bay
(AB_TRAFO), and bus-coupler bay (ABC_BC), except the own bus-coupler bay
are needed:
Signal
QQB12OPTR
QB1 or QB2 or both are open.
VPQB12TR
The switch status of QB1 and QB2 are valid.
EXDU_12
No transmission error from the bay that contains the above information.
Section 15
1MRK 506 369-UEN B
Control
664
Line distance protection REL670 2.2 IEC
Application manual
Содержание REL670 2.2 IEC
Страница 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Страница 2: ......
Страница 32: ...26 ...
Страница 70: ...64 ...
Страница 110: ...104 ...
Страница 152: ...146 ...
Страница 564: ...558 ...
Страница 570: ...564 ...
Страница 592: ...586 ...
Страница 706: ...700 ...
Страница 804: ...798 ...
Страница 848: ...842 ...
Страница 860: ...854 ...
Страница 882: ...876 ...
Страница 896: ...890 ...
Страница 906: ...900 ...
Страница 907: ...901 ...