8.15.3
Setting guidelines
SEMOD171741-1 v1
8.15.3.1
Scheme communication and tripping for faults occurring during
power swinging over the protected line
SEMOD131360-4 v2
The IED includes generally up to five distance protection zones. It is possible to
use one or two of them intentionally for selective fault clearing during power
swings only. Following are the basic conditions for the operation of the so called
(underreaching and overreaching) power-swing zones:
•
They must generally be blocked during normal operation and released during
power swings.
•
Their operation must be time delayed but shorter (with sufficient margin) than
the set time delay of normal distance protection zone 2, which is generally
blocked by the power swing.
•
Their resistive reach setting must secure, together with the set time delay for
their operation, that the slowest expected swings pass the impedance operate
area without initiating their operation.
Communication and tripping logic as used by the power swing distance protection
zones is schematically presented in figure
.
The operation of the power swing zones is conditioned by the operation of Power
swing detection (ZMRPSB) function. They operate in PUTT or POTT
communication scheme with corresponding distance protection zones at the remote
line end. It is preferred to use the communication channels over the optionally
available “Line Data Communication Module - LDCM” and the “Binary signal
transfer to remote end” function. It is also possible to include, in an easy way (by
means of configuration possibilities), the complete functionality into regular
scheme communication logic for the distance protection function. The
communication scheme for the regular distance protection does not operate during
the power-swing conditions, because the distance protection zones included in the
scheme are normally blocked. The powerswing zones can for this reason use the
same communication facilities during the power-swing conditions.
Only one power swing zone is necessary in distance protection at each line
terminal, if the POTT communication scheme is applied. One underreaching power
swing zone, which sends the time delayed carrier signal, and one overreaching
power swing zone, which performs the local tripping condition, are necessary with
PUTT schemes.
The operation of the distance protection zones with long time delay (for example,
zone 3) is in many cases not blocked by the power swing detection elements. This
allows in such cases the distance protection zone 3 (together with the full-scheme
design of the distance protection function) to be used at the same time as the
overreaching power-swing zone.
Section 8
1MRK 506 369-UEN B
Impedance protection
418
Line distance protection REL670 2.2 IEC
Application manual
Содержание REL670 2.2 IEC
Страница 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Страница 2: ......
Страница 32: ...26 ...
Страница 70: ...64 ...
Страница 110: ...104 ...
Страница 152: ...146 ...
Страница 564: ...558 ...
Страница 570: ...564 ...
Страница 592: ...586 ...
Страница 706: ...700 ...
Страница 804: ...798 ...
Страница 848: ...842 ...
Страница 860: ...854 ...
Страница 882: ...876 ...
Страница 896: ...890 ...
Страница 906: ...900 ...
Страница 907: ...901 ...