Setting of the resistive reach for the underreaching zone 1 should follow the
condition to minimize the risk for overreaching:
RFPEZx
4.5 X1Zx
IECEQUATION2305 V2 EN-US
(Equation 391)
The fault resistance for phase-to-phase faults is normally quite low, compared to
the fault resistance for phase-to-earth faults. To minimize the risk for overreaching,
limit the setting of the zone 1 reach in resistive direction for phase-to-phase loop
measurement to:
6
1
RFPPZx
X Zx
IECEQUATION2306 V3 EN-US
(Equation 392)
Note that
RLdFw
and
RLdRv
[7]
are not only defining the load encroachment
boundary. They are used internally as reference points to improve the performance
of the phase selection. In addition, they define the impedance area where the phase
selection element gives indications, so do not set RLdFw and RLDRVFactor to
excessive values even if the load encroachment functionality is not needed (that is,
when the load is not encroaching on the distance zones). Always define the load
encroachment boundary according to the actual load or in consideration of how far
the phase selection must actually reach.
8.13.4.8
Load impedance limitation, without load encroachment function
GUID-16C2EB30-7FEA-42E4-98C8-52CCC36644C6 v5
The following instructions are valid when setting the resistive reach of the distance
zone itself with a sufficient margin towards the maximum load, that is, without the
common load encroachment characteristic (set by
RLdFw
,
RLdRv
[8]
and
ArgLd
).
Observe that even though the zones themselves are set with a margin,
RLdFw
and
RLdRvFactor
still have to be set according to maximum load for the phase
selection to achieve the expected performance.
Check the maximum permissible resistive reach for any zone to ensure that there is
a sufficient setting margin between the boundary and the minimum load
impedance. The minimum load impedance (Ω/phase) is calculated as:
[7] RLdRv=RLdRvFactor*RLdFw.
[8] RLdRv=RLdRvFactor*RLdFw.
1MRK 506 369-UEN B
Section 8
Impedance protection
Line distance protection REL670 2.2 IEC
401
Application manual
Содержание REL670 2.2 IEC
Страница 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Страница 2: ......
Страница 32: ...26 ...
Страница 70: ...64 ...
Страница 110: ...104 ...
Страница 152: ...146 ...
Страница 564: ...558 ...
Страница 570: ...564 ...
Страница 592: ...586 ...
Страница 706: ...700 ...
Страница 804: ...798 ...
Страница 848: ...842 ...
Страница 860: ...854 ...
Страница 882: ...876 ...
Страница 896: ...890 ...
Страница 906: ...900 ...
Страница 907: ...901 ...