App 3-9
IM CW140-E
Appendix 3.
Explanation of Data Item to be Saved/Printed
App
Explanation of Data Item to be Saved/Printed
2 Dual-load Measurement
Output date
OUTPUT DATE
Output time
OUTPUT TIME
Demand start date/
demand period start date
DEM START DATE
Demand start time/
demand period start time
DEM START TIME
Demand end date/
demand period end date
DEM END DATE
Demand end time/
demand period end time
DEM END TIME
Elapsed time
ELAPSED TIME
Number of demand periods
DEMAND
Load 1
Load 2
Voltage (V)
V1-1,V2-1,V3-1
V1-2,V2-2,V3-2
Note1
Current (A)
|1-1,|2-1,|3-1
|1-2,|2-2,|3-2
Active power (W)
P-1
P-2
Reactive power (Var)
Q-1
Q-2
Apparent power (VA)
VA-1
VA-2
Power factor
PF-1
PF-2
Phase angle (°)
PA-1
PA-2
Frequency (Hz)
F-1
F-2
Note1
Total electric energy (Wh)
Wh-1
Wh-2
Demand (W)
Dem_P-1
Dem_P-2
Date of maximum demand
Dem_P_Max_Date-1 Dem_P_Max_Date-2
Time of maximum demand
Dem_P_Max_Time-1 Dem_P_Max_Time-2
Maximum demand (W)
Dem_P_Max-1
Dem_P_Max-2
Load factor (%)
Dem_Load-1
Dem_Load-2
Electric energy of demand period
Dem_Wh-1
Dem_Wh-2
(Wh)
Event input
EVENT
Note 1: As load 1 and load 2 have the same voltages and frequencies, the
same values are output.
Summary of Contents for CW140
Page 1: ...User s Manual CW140 CLAMP ON POWER METER IM CW140 E IM CW140 E 3rd Edition July 2001 YK ...
Page 2: ......
Page 14: ......
Page 72: ......
Page 102: ......
Page 138: ......
Page 152: ......
Page 160: ......
Page 200: ......
Page 256: ......
Page 274: ......
Page 276: ......
Page 286: ......
Page 289: ......