![Water I.D. Primelab 2.0 Manual Download Page 202](http://html2.mh-extra.com/html/water-i-d/primelab-2-0/primelab-2-0_manual_3564857202.webp)
27
Gently swirl the cuvette to mix the liquid well.
28
Insert the cuvette into the PrimeLab. Pay attention to the arrow on the front of the cuvette.
29
Tap TEST to start a 02:00 minute(s) countdown.
30
After the lapse of a 02:00 minute(s) countdown the measured value is displayed.
Notes:
DPD 1 A and DPD 1 B reagent MUST be added to the vial BEFORE water sample is added to
avoid misreadings!
Make sure no ozone escapes while preparing the sample. The measurement must be
performed directly after sampling.
Shake the liquid reagent thoroughly before adding the liquid to the vial.
Liquid reagents should be stored at temperatures of 5 - 10 °C in securely closed bottles.
If the sample water contains further oxidizing agents, these will react like ozone and contribute
to the measurement result.
If the sample water contains more than 30 mg/l ozone, a measured value of 0 mg/l can be
displayed. In that case, a dilution is recommended.
Turbidity caused by high concentration of calcium ions will affect the measurement result. To
prevent that, please use DPD HC (High Calcium) reagents.
Do not clean glassware and equipment with household detergents, as these could greatly
reduce the measurement result. To prevent any contamination, the cuvette, lid and stirrer
should be stored in a 0.1 % sodium hypochlorite solution for one hour. Then rinse with distilled
water, thoroughly.
The DPD reagent buffers the pH value of the sample water in the range of 6.2 to 6.5, which is
essential for colour development. If the sample water is very alkaline or acidic, this must be
adjusted to a pH within the range of 6 to 7 by addition of 0.5 mol/l sulphuric acid or 1 mol/l
caustic soda, respectively, before the DPD reagent is added.
T147/204
T147/204
Summary of Contents for Primelab 2.0
Page 17: ...EMPTY due to technical reasons 16 PrimeLab2 0...
Page 31: ...EMPTY due to technical reasons 30 PrimeLab2 0...
Page 35: ...EMPTY due to technical reasons 34 PrimeLab2 0...
Page 37: ...EMPTY due to technical reasons 36 PrimeLab2 0...
Page 41: ...40 EMPTY due to technical reasons PrimeLab2 0...
Page 45: ...due to technical reasons EMPTY 44 PrimeLab2 0...
Page 252: ...NTU standards should be stored at 5 25 C T197 204 T197 204...
Page 261: ...EMPTY due to technical reasons 48 PrimeLab2 0...
Page 267: ...EMPTY due to technical reasons 54 PrimeLab2 0...
Page 283: ...70 due to technical reasons EMPTY PrimeLab2 0...
Page 293: ...due to technical reasons EMPTY 80 PrimeLab2 0...