EUROBLOC
SERVICE MANUAL FOR HOIST
122/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
3
4
Tighten the fixing screws and test the operation.
The motion downwards must stop at the described distance.
Repeat step 1…3 until the correct setting is achieved.
Reassemble machinery cover and close the connection box
cover (2).
CAUTION
Make sure that there is at least five turns of the rope left on the drum when the
hook is at the lowest position. Otherwise the rope guide and the rope clamp
could interfere and damage.
7.1.12.2 Maintenance task for hoisting limit switch, hoist frame size: VTs.
1
2
Check that the locking screws (3) are tight. Check the wiring
for loose connections.
Check the proper tripping point of lower limit function. If the
limit is not proper one, refer to the chapter “Adjustment” for
correcting the limit.