EUROBLOC
SERVICE MANUAL FOR HOIST
181/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
1
2
Check that the rope clamp-nuts (4) are tight.
Ensure that the rope (1) has not slipped in the rope
anchorage (2) by comparing the measurements with the
dimensions in the previous table.
3
4
Make sure the rope (1) end protrudes from the rope
anchorage (2) as specified in the previous table.
Check the condition of the rope (1) at point A.
7.3
Trolley
7.3.1 Trolley
Trolley leads the rope forces to the crane structure
Single girder trolley
Single-girder trolleys are available in two versions (normal and low headroom), where the available height above
the main girders determines the construction. Single-girder trolleys are commonly used in applications where lighter
load handling is required.