EUROBLOC
SERVICE MANUAL FOR HOIST
76/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
1. Pressure roll
2. Roller adjustment screw
3. Limit switch adjustment screw
4. Limit switch
Disassembly
1
2
Lower hook to the floor and switch OFF the power supply to
the hoist. Remove the machinery covers.
Unscrew the limit switch adjustment screw (3) a few turns and
remove the limit switch (4) along with the attachment plate.
3
4
Loosen the nut (5) and remove the roller adjustment screw (2)
with the spring.
Remove the screw (6) and remove the housing (7).
5
6
Unscrew the bolts from both torque arms (8) and remove the
pressure roller from the end plates. Remove the sleeve
bearing (9) from the torque arm.
The pressure roller bearings are press-fitted inside the roller
tube (1). Tap gently with a rubber hammer to remove the
bearings.
Unscrew the nut to remove the bearings (10), the sleeves
(11), and the washers from the bolt.