EUROBLOC
SERVICE MANUAL FOR HOIST
142/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Reeving code: 26, 28, hoist frame size: VT3, VT4, VT5. After year 2010 product update.
1. Rope anchorage
2. Left hand lay rope
3. Right hand lay rope
4. Hook block (straight sheave shafts)
5. Return sheaves
6. Return sheave shaft (straight)
Note: It is important that the rope anchorage is correctly mounted in the overload device or in the suspension.
See the picture for correct direction details of rope anchorage.
Note: Hook block sheaves are angled. It is important that hook block is assembled correctly. See the picture for
correct direction details of hook block.