EUROBLOC
SERVICE MANUAL FOR HOIST
78/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
7
8
Place the spring over the roller adjustment screw (2). Insert
the screw (2) through the housing and thread it in to the
torque arm (8). Lock into position with nut (5).
Install the limit switch (4) to the attachment plate. Insert the
limit switch adjustment screws (3) with springs into the torque
arm threaded holes.
9
Attach the limit switch wires (12) with cable ties on the
housing and the spacer bar. Adjust the pressure roller as far
as possible from the drum surface for the test run. Adjust the
roller according to the procedure given in “Adjustment”.
Adjustment
1
2
Lower hook to the floor and switch OFF the power supply to
the hoist. Remove the machinery covers.
Adjust the pre-stress on the spring by holding the nut (5) on
place and turning the roller adjustment screw (2) so that
length (L) = 47…49 mm.
Adjust screw (2) to adjust the gap (X) between the pressure
roller (1) and the rope to 0…1 mm
L = 47…49 mm
X = 1 mm
3