EUROBLOC
SERVICE MANUAL FOR HOIST
64/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Install the fixing plate (6) to the support plate (7) and install the
nuts and bolts.
Install the pressure roller (1) to the fixing plate. Place the
springs and the fixing nuts (4) around the fixing screws.
3
4
Adjust the spring pre-stress to length (L) = 14 mm by
tightening the nuts (4) on the fixing screws.
L = 14 mm
Adjust the pressure roller (1) to rope level so that roller just
touches the rope. Roller (1) must rotate lightly with finger tips.
5
6
Insert adjustment screw (3) in to the pressure roller plate.
Adjust the screw (3) so the raising the roller (1) by 3…4 mm
activates the limit switch.
L = 14 mm
7
Install the machinery covers. Switch ON the power supply to
the hoist.
Adjustment
1
2
Lower hook to the floor and switch OFF the power supply to
the hoist. Remove the machinery covers.
Adjust the pressure roller (1) to rope level so that roller just
touches the rope. Roller (1) must rotate lightly with finger tips.