EUROBLOC
SERVICE MANUAL FOR HOIST
57/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Disassembly
1
2
Lower the hook to the ground and drive the rest of the rope
out.
Switch OFF the power supply to the hoist.
Remove the rope guide.
Open the rope clamps (3) and remove the rope.
CAUTION
Take into account the weight of falling rope when removing the clamps.
Reassembly
1
2
A: Lubricate the drum surface.
B: Apply the thread locking to bolts. Start reeving placing one
wrap around the drum.
Attach the first rope clamp (3) keeping the rope tail length
twice the rope diameter past the clamp. Tighten the clamp
slightly.
WARNING
On assembly use thread-locking compound Weicon Lock AN302-43 or
equivalent for all screws.
3
4
Tighten the rope on the drum by pulling the rope a few times.
After the rope sits tightly against the drum, install the
remaining rope clamps (3).
Tighten the rope clamps to the specified torque. Reeve the
rope and guide it into the grooves.
Install the rope guide (5) (See topic “Rope guide”). Install the
machinery covers.
Switch on power to the hoist and raise the hook off the
ground.