EUROBLOC
SERVICE MANUAL FOR HOIST
133/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Disassembly
1
2
Switch OFF the power supply to the hoist. Open two screws
and to remove rope (5) through the trigger (4). Remove the
trigger (4) to get access to the bushes (6).
Open the overload device cover. Remove the washer (8),
locking ring (7) and then remove the limit switch assembly
from the shaft.
3
Unscrew the screws to remove the limit switch (3). Remove
the washers and screws to remove the mounting plate (9)
base plate (10).