I-22
2) Assembling cable conduit
Step1:Prepare parts in order shown below
Step2:Assemble as shown
Please follow the above procedure for both conduit sides.
2-H. Lead cable into Conduit
Step1: Lead cable
Step2: Fix bolt
Step3: Slip on other cable parts
2-I. Attach conduit fittings
Screw cable fittings onto the main unit. At this time, keep the fittings on the multi-path junction box
side loose as shown in the right photo.
2-J. Adjust cable length
Step1: Lead cables into the main unit.
Step2: Pull surplus cable from the junction box
side and adjust cable length so about
2cm extends inside of the main unit.
Summary of Contents for UFL-30
Page 1: ...Doc No KF08 001J Ultrasonic Flowmeter UFL 30 Installation Operation Manual ...
Page 11: ... 10 blank ...
Page 12: ...I Installation ...
Page 60: ...II Operation ...
Page 109: ...II 50 blank ...
Page 110: ...III Other ...
Page 123: ...III 14 III 2 5 Dimensions Main Unit ...
Page 128: ...III 19 blank ...
Page 129: ...III 20 blank ...
Page 145: ...III 36 blank ...
Page 165: ...III 56 blank ...