I-16
dd. Hold down the GND part of the coaxial cable by the cable clamp and tighten up the screw firmly.
After that, tighten up the screw of the terminal "TB10" without so strong.
Note that this turn of work is important. When the wrong order, work to clamp GND maybe give
a stress to the core conductor of the cable and cut it.
ee. The "DOWN" sensor coaxial cable is similarly processed from aa to dd.
ff. Close the terminal cover.
gg. Finally, tighten the cable gland exactly to fix the cable and to protect against water and dust.
(Torque : Approx. 1.5 N m)
1st
2nd
Summary of Contents for UFL-30
Page 1: ...Doc No KF08 001J Ultrasonic Flowmeter UFL 30 Installation Operation Manual ...
Page 11: ... 10 blank ...
Page 12: ...I Installation ...
Page 60: ...II Operation ...
Page 109: ...II 50 blank ...
Page 110: ...III Other ...
Page 123: ...III 14 III 2 5 Dimensions Main Unit ...
Page 128: ...III 19 blank ...
Page 129: ...III 20 blank ...
Page 145: ...III 36 blank ...
Page 165: ...III 56 blank ...