9. Wrap the tubing snugly around the pump head rollers. Lift up the
bottom tubing clip to open it, insert the tubing into the clip opening,
and then release the clip (see
10. Close the tubing clamp by pushing it to the left until the tabs lock into
place (see
11. Close the pump door, making sure that both tabs are outside the door
12. Connect plumbing lines to the peristaltic tubing fittings as required
for your application. Use the fitting nuts and ferrules provided with
Figure E-7. Peristaltic Tubing Installation Completed
Figure E-8. Peristaltic Pump with Door Closed
Tubing Clamp
(Closed)
Push here
to close the
clamp
Tab
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...