Dionex Integral Systems Operator’s Manual
196
Doc. 065250-06 03/2020
G.1.2
Thermal Control Board Installation Procedure
1. Turn off the SP power.
2. Disconnect the power cord.
3. Follow the instructions in
to access the main SP
electronics board.
4. Screw the two standoffs into the main SP electronics board at the
5. Orient the thermal control board with the component side facing up.
6. Align the connector on the back of the thermal control board with the
corresponding connector near the lower-right corner of the main SP
electronics board (see
7. Press the thermal control board firmly onto the main SP electronics
board. Tighten the two thumbscrews on the thermal control board.
shows the thermal control board (outlined in white)
attached to the main SP electronics board.
Figure G-1. Main SP Electronics Board (Horizontal SP Enclosure Shown)
Install
standoffs here
Thermal
Control
Connector
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...