C • TTL and Relay Installation Instructions
Doc. 065250-06 03/2020
159
Connect the Cables
1. Plug one end of the male-to-male relay cable into the male connector
on the TTL/Relay controller board on the SP door (see
2. Route the relay cable to the inside of the AE. For the horizontal SP
enclosure, you can route the cable through the interior of the SP and
out through the horizontal slot on top of the SP.
3. Plug the free end of the relay cable into the male connector insert
inside the AE.
4. Repeat
through
for the female cable and connector.
5. Close and secure the SP service door.
6. If you previously removed the SP from the AE rear panel:
a.
Lift up the SP, align the four hooks on the rear of the SP with the
mounting rails on the AE rear panel, and hang the SP onto the
rails.
b. Replace any modules that were removed from the lower shelf of
the AE.
c.
Replace the two access panels on the exterior of the AE.
Figure C-8. TTL/Relay Controller Board Installed on Main SP Electronics Board
Male (TTL)
Connector
Female (Relay)
Connector
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...