Dionex Integral Systems Operator’s Manual
158
Doc. 065250-06 03/2020
Install the 25-Pin D-Sub Connector Inserts
1. Lift the lid on the cap that covers one
of the two TTL and relay openings on
the top of the AE (see
2. Remove the screws that attach the cap
to the AE and remove the cap.
3. Install either the female (relay) or
male (TTL) 25-pin D-sub connector
insert into the empty TTL and relay
opening, and secure the insert with
screws.
shows the relay
connector insert installed.
4. Repeat
through
for the
other connector insert.
Figure C-6. Top of AE: TTL and Relay
Openings with Caps
Figure C-7. Connector Insert Installed
Cap with
lid open
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...