C • TTL and Relay Installation Instructions
Doc. 065250-06 03/2020
153
3. Follow the instructions in
to access the main SP
electronics board.
4. Disconnect the cable in the upper-right corner of the main SP
5. Screw the three standoffs into the main SP electronics board at the
6. Orient the TTL/Relay controller board with the component side
facing up and the notched corner on the lower right-hand side (see
7. Align the two connectors on the back of the TTL/Relay controller
board with the connectors labeled
J19 RLY/TTL
and
J24 RLY/TTL
in the
upper-right area of the main SP electronics board.
8. Press the TTL/Relay controller board firmly onto the main SP
electronics board. Tighten the three thumbscrews on the TTL/Relay
controller board.
9. Reconnect the cable that was disconnected in
Figure C-1. Main SP Electronics Board (Horizontal SP Enclosure Shown)
Disconnect
this cable
Install
standoffs (3)
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...