8 • Maintenance
Doc. 065250-06 03/2020
97
8.2
Weekly Maintenance
Completion time: 30-40 min for a dual-system analyzer
8.3
Biweekly Maintenance
Completion time: 1-2 hrs for a dual-system analyzer
Component or Feature
Action
Standard solutions
Prepare new solutions for the check standard and
calibration standard.
Analytical pump
Replace the piston seal wash solution, if used. Record
pump pressure when the load/inject valve is in the load
position.
SS valves
Check for leaks.
Gas and drain
connections
Check all connections, including the drain manifold and
the fluid connection panels. Check for accumulated liquid
on the inside bottom of enclosures. Fix leaks promptly.
Power and signal
connections
Visually inspect all connections and cables. Secure loose
connections; move pinched or strained cables.
Component or Feature
Action
Reagent reservoirs
Thoroughly rinse all reagent reservoirs with deionized
water to remove precipitates.
Eluents, reagent
Prepare new eluents and reagents.
Eluent trap columns (if
used)
Replace trap columns (may be required weekly).
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...