Dionex Integral Systems Operator’s Manual
48
Doc. 065250-06 03/2020
3.8
SP TTL and Relay Control (Option)
When the optional SP TTL and Relay Kit (P/N 068573) is installed, the SP
provides nine relay outputs and eight TTL inputs.
•
The relay outputs allow the SP to control actions in other devices (see
•
The TTL inputs allow other devices to control various analyzer actions (see
When the SP TTL and Relay Kit is installed on an external SP enclosure, the TTL
and relay connectors are installed on the side of the enclosure (see
When the SP is installed inside an AE or mounted on the side of an AE, two
connectors are installed on top of the AE (see
). This configuration
requires installation of the AE TTL and Relay Kit (P/N AAA-068548), in addition
to the SP TTL and Relay Kit.
For installation instructions for the SP TTL and Relay Kit and the AE TTL and
Relay Kit, see
.
Figure 3-29. TTL/Relay Connectors on SP and AE
TTL/Relay Connector on Top of AE
TTL/Relay Connectors on External SP
TTL and Relay
Connectors
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...