Dionex Integral Systems Operator’s Manual
110
Doc. 065250-06 03/2020
2. If you find a leak, tighten fittings (or replace tubing and fittings) as
required. See
for detailed troubleshooting of various types of
leaks.
3. After fixing the leak, dry the drip tray and leak sensor thoroughly. If the
leak sensor is not dry, it will remain activated and will continue to report a
leak to the audit trail.
4. If no leak is found, check the leak sensor’s electrical connection on the
main SP electronics board:
•
Follow the instructions in
to access the main SP
electronics board.
•
The cables for the leak sensors plug into the connectors on the top
edge of the board on the left side (see
Figure 9-1. Main SP Electronics Board (Vertical Enclosure Shown)
Connector for
AE Leak Sensor
Cable
SP Leak
Sensor Cable
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...