Dionex Integral Systems Operator’s Manual
178
Doc. 065250-06 03/2020
13. Tighten the gray fitting.
14. Inside the AE, locate
the connectors on the
top left side. Remove
the jumper from the
second connector
from the left (see
). (To do
so, squeeze the front
of the jumper and pull
down.)
Figure D-8. AE Interior: Remove Jumper
NOTE Save the jumper; it must be reinstalled if the
purge control cable is not connected.
15. Plug the purge control cable into the connector where the jumper was
removed (see
Figure D-9. AE Interior: Purge Control Cable Connection
Remove this jumper
Purge Control Cable
Summary of Contents for Dionex
Page 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Page 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Page 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Page 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Page 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Page 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Page 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Page 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Page 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Page 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Page 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...