3-14 ENGINE
• Install the exhaust pipes, muffler chamber and mufflers.
(
6-16)
• Connect the EXCV cables and install the bracket
.
"
EXCV cable bracket nut: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
• Fit the new O-rings to the union of the oil cooler pipes.
• Apply thread lock to the bolts, install the oil cooler hose.
H
99000-32110: THREAD LOCK SUPER “1322”
or equivalent
"
Oil cooler bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
• Perform service and adjustment in the following items.
* Gearshift lever position (
10-34)
* Engine oil (
2-12)
* Engine coolant (
2-18)
* Throttle cable play (
2-15)
* Clutch operation (
2-16)
* Throttle valve synchronization (
5-27)
* Drive chain slack (
2-21)
* Wiring harness, cables and hoses routing (
10-14 to -24)
Replace the gaskets and connectors with new ones.
Summary of Contents for GSX-R1000 2007
Page 43: ...PERIODIC MAINTENANCE 2 31...
Page 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Page 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Page 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Page 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Page 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Page 549: ...Printed in Japan K7...