EXHAUST SYSTEM 6-1
4
6
EXHAUST SYSTEM
CONTENTS
EXHAUST SYSTEM..................................................................................... 6- 2
EXHAUST CONTROL SYSTEM ........................................................... 6- 2
OPERATION.......................................................................................... 6- 3
EXCVA (EXHAUST CONTROL VALVE ACTUATOR) AND
EXCV (EXHAUST CONTROL VALVE)........................................................ 6- 4
EXCVA REMOVAL................................................................................ 6- 4
EXCVA PULLEY INSPECTION............................................................. 6- 5
EXCVA INSTALLATION ....................................................................... 6- 6
EXCVA INSPECTION............................................................................ 6- 7
EXCV CABLE REPLACEMENT............................................................ 6- 7
EXCVA ADJUSTMENT ......................................................................... 6-10
MUFFLER, MUFFLER CHAMBER AND
EXCV/EXHAUST PIPE REMOVAL ....................................................... 6-12
EXCV INSPECTION .............................................................................. 6-15
MUFFLER, MUFFLER CHAMBER AND
EXCV/EXHAUST PIPE INSTALLATION............................................... 6-16
Summary of Contents for GSX-R1000 2007
Page 43: ...PERIODIC MAINTENANCE 2 31...
Page 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Page 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Page 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Page 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Page 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Page 549: ...Printed in Japan K7...