CHASSIS 8-27
INSTALLATION
Install the front fork in the reverse order of removal. Pay atten-
tion to the following points:
• Set the upper surface of the outer tube height
"
at 7.0 mm
(0.276 in) from the upper surface of the steering stem upper
bracket and tighten the front fork lower clamp bolts
to the
specified torque.
"
Front fork lower clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Tighten the front fork cap bolt
to the specified torque and
recheck the front fork outer tube upper surface height
"
from
the upper surface of the steering stem upper bracket.
"
Front fork cap bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Position the handlebars on the upper bracket. (
8-40)
• Tighten the front fork upper clamp bolt
and handlebar
clamp bolt
.
"
Front fork upper clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Handlebar clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Remount the front wheel. (
8-14)
• Cable routing (
10-17)
• Front brake hose routing (
10-21)
Summary of Contents for GSX-R1000 2007
Page 43: ...PERIODIC MAINTENANCE 2 31...
Page 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Page 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Page 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Page 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Page 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Page 549: ...Printed in Japan K7...