3-78 ENGINE
• Apply bond to the mating surface of the middle crankcase.
D
99000-31140: SUZUKI BOND “1207B” or equivalent
NOTE:
Use of bond is as follows:
* Make surfaces free from moisture, oil, dust and other foreign
materials.
* Spread on surfaces thinly to form an even layer, and assemble
the crankcases within few minutes.
* Take extreme care not to apply any bond to the oil hole, oil
groove and bearing.
* Apply to distorted surfaces as it forms a comparatively thick
film.
• Tighten the crankshaft journal bolts (M9) in ascending order
of numbers assigned to these bolts. Tighten each bolt a little
at a time to equalize the pressure in the following two steps.
"
Crankshaft journal bolt (M9):
Initial: 18 N·m (1.8 kgf-m, 13.0 lb-ft)
Final : 50°
1
2
3
4
5
6
7
8
9
10
Summary of Contents for GSX-R1000 2007
Page 43: ...PERIODIC MAINTENANCE 2 31...
Page 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Page 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Page 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Page 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Page 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Page 549: ...Printed in Japan K7...