8-98 CHASSIS
• Place the drive chain link being disjointed on the holder part
of the tool.
• Turn in both the adjuster bolt
and pressure bolt “A”
so
that each of their end hole fits over the chain joint pin properly.
• Tighten the pressure bolt “A”
with the bar.
• Turn in the pressure bolt “B”
with the bar
and force out
the drive chain joint pin
.
NOTE:
After the joint pin
is removed, loosen the pressure bolt “B”
and then pressure bolt “A”
.
• Remove the joint pin
of the other side of joint plate.
DRIVE CHAIN CONNECTING
JOINT PLATE INSTALLATION
• Set up the special tool as shown in the illustration.
Tool body
Adjuster bolt
Grip handle
(without hole)
Joint plate holder
Pressure bolt “A”
(engraved mark “F50”)
Bar
Wedge holder & wedge pin
• Connect both ends of the drive chain with the joint pin
inserted from the wheel side
"
as installed on the motorcycle.
O-ring … 4 pcs.
Joint plate
Joint set part number
DID: 27620-40F00
Continue turning in the pressure bolt “B”
until the
joint pin has been completely pushed out of the chain.
Never reuse joint pins, O-rings and plates. After joint
pins, O-rings and plates have been removed from the
drive chain, the removed joint pins, O-rings and plates
should be discarded and new joint plate, O-rings and
plate must be installed.
Do not use joint clip type of drive chain. The joint clip
may have a chance to drop which may cause severe
damage to motorcycle and severe injury.
(F50)
Summary of Contents for GSX-R1000 2007
Page 43: ...PERIODIC MAINTENANCE 2 31...
Page 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Page 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Page 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Page 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Page 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Page 549: ...Printed in Japan K7...