4-42 FI SYSTEM DIAGNOSIS
6) Disconnect the ECM coupler.
7) Check the continuity between G/B wire
and terminal
*
.
8) If OK, then check the continuity between B/Br wire
and ter-
minal
:
.
IAPS lead wire continuity: Continuity (
?
)
\
09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
=
Tester knob indication: Continuity test (
?
)
Is the continuity OK?
9) After repairing the trouble, clear the DTC using SDS tool.
(
4-28)
Step 1 (When indicating P0105-L:)
1) Turn the ignition switch OFF.
2) Lift and support the fuel tank. (
5-3)
3) Check the IAP sensor coupler
for loose or poor contacts.
If OK, then check the IAP sensor lead wire continuity.
4) Disconnect the IAP sensor coupler.
5) Check the continuity between G/B wire
and ground.
6) Also, check the continuity between G/B wire
and B/Br wire
. If the sound is not heard from the tester, the circuit condi-
tion is OK.
YES
Go to Step 2.
NO
G/B wire shorted to VCC, or B/Br wire open.
1
?
ECM coupler (Harness side)
(Black)
(Gray)
1
V
1
Summary of Contents for GSX-R1000 2007
Page 43: ...PERIODIC MAINTENANCE 2 31...
Page 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Page 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Page 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Page 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Page 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Page 549: ...Printed in Japan K7...