EMISSION CONTROL INFORMATION 11-7
• Connect the 12 V battery to the PAIR control solenoid valve
terminals and check the air flow.
• If air does not flow out, the solenoid valve is in normal condi-
tion.
• Check the resistance between the terminals of the PAIR con-
trol solenoid valve.
Resistance: 18 – 22
Ω
at 20 – 30 °C (68 – 86 °F)
\
09900-25008: Multi-circuit tester set
V
Tester knob indication: Resistance (
Ω
)
INSTALLATION
If the resistance is not within the standard range, replace the
PAIR control solenoid valve with a new one.
Installation is in the reverse order of removal.
• Connect the PAIR control solenoid valve lead wire coupler
and PAIR hoses securely. (
10-24)
12V
Summary of Contents for GSX-R1000 2007
Page 43: ...PERIODIC MAINTENANCE 2 31...
Page 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Page 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Page 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Page 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Page 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Page 549: ...Printed in Japan K7...