Standard Operating Procedures
L410 UVP-E20
Document No.:
SOP-L410-0
Page EE - 58
Rev: 1
Date:JAN 18
Prepared by: LA
Checked by : CLS
IN FLIGHT ENGINE STARTING
AB 7
Item
Action
CM
The sequence is the same as in ground starting.
During the starting cycle, switch off all except the most essential electric equipment.
MAXIMUM ALTITUDE
13,000 ft (4,000 m)
PF
ELU circuit breaker of the stopped engine
OFF
PM
RECOMMENDED AIRSPEED
108-119 KIAS
PF
MAXIMUM AIRSPEED
162 KIAS
PF
If flying at an ambient temperature of - 10° (14°F) or lower restart the engine not
later than 2 minutes after it has stopped.
PCL after engine start up
COARSE PITCH
(minimum speed)
PM
PCL after propeller unfeathering
FINE PITCH
(maximum speed)
PM
ELU RH or LH circuit breakers
ON
PM
Summary of Contents for L410 UVP-E20
Page 5: ......