
Standard Operating Procedures
L410 UVP-E20
Document No.:
SOP-L410-1
Page 7- 10
Rev: 1
Date: JAN 18
Prepared by: LA
Checked by : CLS
7.9 Descent Callouts
Descent Callouts
15minsbeforedescent,thePMwillobtain
theweather/ATIS(asapplicable)
Before briefing the approach, the required data must be
configured and set. (ApproachspeedandDA/MDA)
PF:
“Ready for briefing?”
PM:
“Ready”
Thedescentchecklististhencalled
PF:
“Descentchecklist”
Thedescentchecklististhencompleted
PM:
“Descentchecklistcomplete”
When released to a lower altitude, the PM sets the new
assigned altitude in the AMS.
PM:
“……feet set”
PF:
“Check”
1000 feet before the assigned altitude
PF:
“ passing ____ feet descending____
feet”
PF:
“Check”
7.10 Descent Checklist
call out
ARMED
PM
ON
PM
QNH____ SET
Both
COMPLETED
PF
CHECKED & SET
Both
SET
PM
CHECKED & SET
Both
CHECKED
PM
CHECKED
PM
CHECKED
PM
Vref
Spoiler-ABC-Autofeather
Anti-Skid
DESCENT
MINIMUMS/RAD-ALT
ATIS / ATC Clearance
NAV-AVIONICS
MSA/MVA
Fuel Quantity
Altimeters
Approach Briefing
Summary of Contents for L410 UVP-E20
Page 5: ......