10.9
Date Code 20170601
Instruction Manual
SEL-387-0, -5, -6 Relay
Testing and Troubleshooting
Acceptance Testing
d. Connect the dotted C current input terminal to both the
A and B current source returns.
Set the current sources to deliver one ampere with A-
phase at 0 degrees, B-phase lagging A-phase by 120
degrees, and C-phase leading A phase by 120 degrees.
Step 2. Purpose: Verify correct current levels.
Method:
a. Turn relay power on, and use the
METER
command to
measure the currents applied in
.
With applied currents of one ampere per phase and a
current transformer ratio of 120:1 (
SHO CTR1
<Enter>
displays the CT ratios for each winding,
<Ctrl + X>
cancels scrolling), the displayed line
currents should be the applied current, 120 amperes
±3%, ±12 amperes.
Step 3. Purpose: Verify phase rotation.
Method:
a. Verify that residual (IR) and negative-sequence (3I2)
quantities are approximately zero.
If IR equals three times the applied current, all three
phases have the same angle. If 3I2 equals three times
the applied current, the phase rotation is reversed.
b. Turn the current sources off.
Figure 10.3
Test Connections for Balanced Load With Three-Phase
Current Sources
Z01
Z02
IAW1
Z04
Z03
IBW1
Z06
Z05
ICW1
Z08
Z07
IAW2
Z10
Z09
IBW2
Z12
Z11
ICW2
Z14
Z13
IAW3
Z16
Z15
IBW3
Z18
Z17
ICW3
Z20
Z19
IAW4
Z22
Z21
IBW4
Z24
Z23
ICW4
C
B
A
SEL-387
(partial)
Current
Source 1
Current
Source 3
Current
Source 2
Summary of Contents for SEL-387-0
Page 6: ...This page intentionally left blank ...
Page 12: ...This page intentionally left blank ...
Page 50: ...This page intentionally left blank ...
Page 200: ...This page intentionally left blank ...
Page 248: ...This page intentionally left blank ...
Page 380: ...This page intentionally left blank ...
Page 422: ...This page intentionally left blank ...
Page 440: ...This page intentionally left blank ...
Page 458: ...This page intentionally left blank ...
Page 516: ...This page intentionally left blank ...