
9. Servicing / Maintenance
244 | 268
Original Operating Manual | Edition 1.0 (01-2020) | CrimpCenter 64 SP
9.12
MAINTENANCE SHEET - PNEUMATICS - DRAIN CONDENSATION
Pneumatic - Drain Condensate
Task
Check and drain accumulated condensate.
Unit
Pneumatic Unit - Manometer
Duration
approx 1 min.
Interval
Monthly
Personnel qualifica-
tion
Qualified Personnel
Parts
Absorbent cloth
WARNING
Personnel Qualification and Personal Protective Equipment!
The following instructions are to be followed!
Maintenance work may only be executed by technical specialist.
See also chapter “Personnel Qualification” and “Personal Protective
Equipment”.
DANGER
Risk of injury if not observed!
You may suffer serious injuries, if the machine is switched on acciden-
tally!
The following instructions are to be followed!
Prior to operating the following points have to be observed:
Put the main switch in position "OFF"!
Protect the machine against reactivation.
Take appropriate measures to ensure, that only you can reactivate
the machine.
Affix a warning sign: "Do not switch on the Machine!"
DANGER
Risk of injury if not observed!
You may suffer serious injuries, if the machine is switched on acciden-
tally!
The pneumatic system is pressurized.
Working on pressurized system can cause serious accidents.