1. Points regarding refrigerant piping construction
Caution
●
In order to prevent oxidizing films inside the piping, purge the piping with nitrogen.
●
Commercial anti-oxidants have adverse reactions on refrigerants and the refrigeration oil, so they should not
be used.
Fig. 5
5
Gas-tightness testing and evacuation
●
It is a requirement of the High Pressure Gas Safety Law to carry out a gas-tightness test on gas heat pump air
conditioning systems. Therefore, carry out the following points to verify that there are no leaks from the joints
in the piping.
●
After connecting the gage manifold to the service ports on both the gas pipe (thick pipe) and the
liquid pipe (thin pipe) sides, connect the nitrogen and vacuum pump as shown in Fig. 6.
●
Raise the pressure to the testing level of
3.0MPa with nitrogen, and check for leaks.
Leakage of refrigerant can be the cause of
accidents due to lack of oxygen.
Caution
●
After completing the gas-tightness test,
evacuate the indoor unit and the piping
down to 667Pa.
●
After completing evacuation, do not leave it
for a long period of time.
(
Note
)
Each service port has a check
valve.
(4)Adding additional refrigerant charge
The quantity of refrigerant charged at the time of shipping did not consider the length of piping. Add additional
refrigerant appropriate to the length of piping.
Weighing
scales
Gage manifold
Gas side
Liquid side
Pressure
regulator
Pressure meter
Siphon
pipe
Vacuum pump
Nitr
og
en
Refrigerant
container
Fig. 6
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...