Design
D - 20
■
Calculate the effective inflow height, we (m) of each wall. Depending upon the wall height,
and the flow in height
Ha the following two formulae apply.
For Hw Ha : Hwe =(Ha-(H
U
+H
H
+Ht))×Xw+(H
U
+U
H
+Ht)×Xw×2
For Hw<Ha : Hwe =Ha-Hw+
[
Hw-
(H
U
+U
H
+Ht)
]
×Xw+(H
U
+U
H
+Ht)×Xw×2
here Hw
: Wall height(m)
Xw
: Wall opening fraction
•The wall height below the exhaust part (H
U
+U
H
+Ht) is
given twice
the weighting of other parts(inflow wind speed
0.5m/s
J
1m/s).
•When there is no wall Hwe =Ha.
ii) Wall does not allow passage of air
■
From the following formula, calculate the apparent height
Hb
1•2•3•4
(m) of each wall.
Hb = Hw-H
u
-1.5×Ht
Here, Hb: Apparent height of wall(m)
Hw: height of wall(m)
■
For each wall, using the diagram on the right, obtain the effective
flow in height Hwe
1•2•3•4
(m) of each wall.
b)Calculate the effective flow in length Le
For the effective flow in height Hwe calculated for each wall,
calculate the effective flow in length Le
1•2•3•4
(m).
Calculate the effective length form each boundary surface (wall surface) to the nearest unit Lwei(m).
Calculate the effective flow in length of each wall Le
1•2•3•4
(m).
c) Calculate the effective flow in area
Using the effective flow in height Hwe
1•2•3•4
for each wall and the effective flow in length Le
1•2•3•4
calculated above,
obtain the effective flow in area of each wall.
i) Calculate the effective flow in area for each wall Se
1•2•3•4
(m).
ii) Calculate the overall effective flow in area Set(m
2
).
iii)Calculate the area of adjoining two surfaces.
when there is no wall
: Lwei=6
For Lwi 6m
: Lwei=6
For Lwi<6m
: Lwei=Lwei
Le
1
=L
N
+Lwe
4
+Lwe
2
Le
2
=L
M
+Lwe
3
+Lwe
1
Le
3
=Le
1
Le
4
=Le
2
Se
1
=Hwe
1
×Le
1
Se
2
=Hwe
2
×Le
2
Se
3
=Hwe
3
×Le
3
Se
4
=Hwe
4
×Le
4
Se
12
=Se
1
+Se
2
Se
23
=Se
2
+Se
3
Se
34
=Se
3
+Se
4
Se
41
=Se
4
+Se
1
Appar
en
t h
ei
g
h
t o
f wall(m)
distance from the wall(m)
th
e effective flow in h
ei
gh
t
wh
en th
er
e is
n
o
wall
Set=Se
1
+Se
2
+Se
3
+Se
4
5. Criteria for positioning the outdoor unit
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...