Control
C - 2
(1) Control Characteristics
1
Operation Control
Thermostat ON/OFF Control
Depending on the setting temperature and the room temperature, the thermostat signal will be turned ON
or OFF. When the thermostat signal is turned ON then the outdoor unit’s engine is operating.
●
When the blower is operating the thermostat is always OFF.
●
With an indoor unit, after turning the thermostat ON, it stays on
for 3 minutes.
●
With an indoor unit, after turning the thermostat OFF, it stays off
for 1 minute.
●
For information regarding freezing prevention, refer to item .
1) Cooling operation mode (dry operation mode)
2) Heating operation mode
The value a is the intake temperature (room temperature) shift value during heating.
Refer to the table below for the initial setting value of a.
The setting of the a value can be changed with wired remote control.
For further details, refer to the wired remote control setting items.
When using the remote control thermostat, regardless of the setting a = 0.
Body sensor:
Remote control sensor:
Setting temperature:
Body sensor:
Remote control sensor:
Thermostat signal
Body sensor:
Remote control sensor:
Setting temperature:
Body sensor:
Remote control sensor:
Thermostat signal
Indoor unit type
a Value
1-direction ceiling cassette type, 4-direction ceiling cassette type, 2-direction ceiling
cassette type, 1-direction cassette type for high ceilings, ceiling built-in type, built-in
all duct type, ceiling hung type, embedded in ceiling type, ceiling hung type for
kitchen use, External air processing unit with direct expanding coil
4deg
Wall mounted type
2deg
Floor mounted type for the perimeter, floor embedded type for the perimeter, floor
mounted type
0deg
1. Operation control
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...