Separately sold parts
F - 3
2. System Configuration
Component B
Stopper
Seal material to
be applied to
the whole circumference
Component A
Screw hole positions
(Note)
Seal material to be Shinetsu Chemicals
RTV-KE 45 or equivalent.
Condition of the seal material
around the bottom of the stopper
to be corrected.
Screws (2)
removed at d)
Fig. 5
Adaptor for
exhaust gas extension
Exhaust gas top
Alignment mark
on the female side
Fig. 6
ONJ pipe female connector
alignment mark
Male side connector
warning mark (red line)
Exhaust gas top
9) Apply seal material to the two locations indicated in the above diagram, for the whole circumference for
about 3-5mm.
10) Insert component B onto component A, while aligning the screw holes of components A and B, until the
stopper of component B is reached.
11) Secure component B with the 2 screws removed at 4).
12) Apply seal material around the 2 holes where the 2 screws above are installed, and correct the condition
of the seal material at the bottom of stopper.
13) Be sure to install the exhaust gas top on the end of the exhaust gas pipe.
14) Insert the exhaust gas top onto the ONJ pipe until the warning mark (red line) on the male connector
becomes hidden. Refer to figure 6.
15) After connecting, rotate the alignment mark on the female connector through approx. 30°, to prevent it
from being pulled out. (See Figure 6)
16) The exhaust gas top should be installed vertically as shown in Figure 5.
■
Cautions regarding construction
●
Cautions regarding connecting the ONJ pipe
1) When connecting the ONJ pipe, insert until the warning mark (red line) on the male connector side
becomes hidden. When it is securely connected a “click!” will be heard. Refer to Figure 6.
2) Do not cut the ONJ pipe under any circumstances. If size adjustment is necessary use a slide pipe.
3) After connecting, if it becomes necessary to disconnect, rotate the alignment mark on the female side
and return to the position in Figure 6, and pull the component out.
4) For other points regarding the ONJ pipe, refer to the maker’s instruction manual.
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...