Design
D - 38
(4) Example anchor bolt calculation
Earthquake resistance evaluation of
SGP-E90J2GU2(10 HP outdoor unit)
The earthquake resistance rank is common use, so the design horizontal earthquake factor K
H
is 1.0G.
(*K
H
= 1.0 is for installation on a roof. For installation on the ground K
H
= 0.4
)
Refer to Item (3) for the position of the center of gravity of the equipment
Foundation bolts
•
N
•
•
umber of bolts = 4
• Bolt diameter M12
*If as a result of the calculation this is not acceptable, change the conditions and re-calculate.
Example of evaluation by calculation
Foundation bolt conditions
Total no. of bolts(N
)
N
=
㩷 㩷
4
㩷
………..current models have 4 bolts
bolt diameter(D
)
D
=
㩷 㩷
12 mm ………..for M12 bolts
bolt cross-sectional area(A
)
A
=
D
2
/4 =
㩷
113 mm
2
bolts on one side
䋺
short direction(n
1
)
n
1
=
㩷
2
㩷 㩷
………..current models have 2 bolts
㩷 㩷 㩷 㩷 㩷 㩷
long direction(n
2
)
n
2
=
㩷
2
㩷 㩷
………..current models have 2 bolts
The installation method is “embedded J type, JA type bolts”, on a slab 12cm thick.
Foundation bolt allowable short term tensile load(T
a
)
………..T
a
=
㩷
11,760
㩷
N
(It is also acceptable to decide the installation method after completing the calculation
)
Calculation
Design horizontal magnitude(K
H
)
K
H
=
㩷
1.0
㩷 㩷
………..installation location:K
H
on roof: 1.0
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
on ground:0.4
Operating load(W
)
W
=
㩷
6,566
㩷
N ……….. 70 type:6,860
(=operating mass×9.8
)
90 type:7,056
120 type:9,310
150 type:9,310
190 type:9,604
Horizontal earthquake force(F
H
)
F
H
= K
H
䊶
W=
㩷 㩷
7,056 N
㩷 㩷
㩷
Height of center of gravity(h
)
h
G
=
㩷
700 mm ………..70, 90 type
:700
120, 150, 190 type
:720
Vertical earthquake force(F
V
)
F
V
=F
H
/2=
㩷
3,528 N
Distance from center of gravity to bolt
S
hort direction(
l
G1
)
l
G1
=
㩷 㩷
485
㩷
mm
㩷
………..70, 90 type
:485
120, 150 type
:495
190 type
:475
L
ong direction(
l
G2
)
l
G2
=
㩷 㩷
515
㩷
mm
㩷
……….. 70, 90 type
:515
120, 150, 190 type
:525
1
1
2
2
3
π
7. Center of gravity position and earthquake resistant design
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...