Construction
E - 16
Terminal board
for remote control
cabling
Terminal board
for remote control
cabling
Remote
control
cable
Remote
control
(parent)
Remote
control
(child)
Remote
control
(parent)
Remote
control
(child)
Separately
sold item
Separately
sold item
Separately
sold item
Separately
sold item
Bus system cable for
group control
Indoor/outdoor
operation cable
Grounding
Grounding
Grounding
Grounding
Indoor
unit 1
Indoor
unit 2
Indoor
unit 3
Indoor
unit
Grounding
Grounding
Grounding
Grounding
(Maximum 8 units can be connected)
Bus system cable for group control
Remote
control
Remote
control
wiring
Indoor/outdoor
operation cable
Separately
sold item
Indoor
unit(UH)
Indoor
unit 2
Indoor
unit 3
Indoor
unit 8
<Cable diagram of group control including multi-type indoor units>
Caution:Make sure there is no mistakes in the cabling. (Mistaken cabling will cause a breakdown.)
●
Cabling procedure
Carry out the cabling according to the following procedure.
1)Connect the remote control to the remote control terminal board (1, 2) of the group indoor unit 1.
2)Connect (1, 2) of the remote control terminal of group indoor unit 1 to (1, 2) of the remote control
terminal of group indoor unit 2, using a 2-wire bus system. Next, from indoor unit 2 connect to the
remote control terminal board of the next unit(indoor unit 3) in a bus system. In this way, connect all
the indoor units in a bus system.
3)Connect the indoor/outdoor operation cable.
4)The remote control cable has no polarity.
■
Control with 2 remote controls
❋
Control with 2 remote controls allows one or several indoor units to be operated with two remote controls.
(A maximum of 2 can be connected)
●
One indoor unit connected
to and operated by two
remote controls
●
Two remote controls connected and operating
3. Points regarding electrical construction (indoor unit)
Summary of Contents for SGP-E120J2GU2
Page 49: ...Design D 5 2 Operating temperature ranges for heating and cooling Cooling Heating ...
Page 87: ...Design D 43 8 Salt resistant specification ...
Page 109: ...Construction E 22 4 Outdoor unit installation and construction ...
Page 110: ...Construction E 23 4 Outdoor unit installation and construction ...
Page 111: ...Construction E 24 4 Outdoor unit installation and construction ...
Page 112: ...Construction E 25 4 Outdoor unit installation and construction ...
Page 113: ...Construction E 26 4 Outdoor unit installation and construction ...
Page 114: ...Construction E 27 4 Outdoor unit installation and construction ...
Page 115: ...Construction E 28 4 Outdoor unit installation and construction ...
Page 116: ...Construction E 29 4 Outdoor unit installation and construction ...
Page 117: ...Construction E 30 4 Outdoor unit installation and construction ...
Page 118: ...Construction E 31 4 Outdoor unit installation and construction ...
Page 119: ...Construction E 32 4 Outdoor unit installation and construction ...
Page 120: ...Construction E 33 4 Outdoor unit installation and construction ...
Page 121: ...Construction E 34 4 Outdoor unit installation and construction ...
Page 122: ...Construction E 35 4 Outdoor unit installation and construction ...
Page 123: ...Construction E 36 4 Outdoor unit installation and construction ...
Page 124: ...Construction E 37 4 Outdoor unit installation and construction ...
Page 127: ...Construction E 40 5 Commissioning ...
Page 128: ...Construction E 41 5 Commissioning ...
Page 129: ...Construction E 42 5 Commissioning ...
Page 130: ...Construction E 43 5 Commissioning ...
Page 131: ...Construction E 44 5 Commissioning ...
Page 132: ...Construction E 45 5 Commissioning ...
Page 133: ...Construction E 46 5 Commissioning ...
Page 134: ...Construction E 47 5 Commissioning ...
Page 135: ...Construction E 48 5 Commissioning ...
Page 136: ...Construction E 49 5 Commissioning ...
Page 137: ...Construction E 50 5 Commissioning ...
Page 138: ...Construction E 51 5 Commissioning ...
Page 139: ...Construction E 52 5 Commissioning ...
Page 140: ...Construction E 53 5 Commissioning ...
Page 141: ...Construction E 54 5 Commissioning ...
Page 142: ...Construction E 55 5 Commissioning ...
Page 143: ...Separately Contents 1 Parts for the outdoor unit 1 Exhaust extension kit F 2 F 1 ...
Page 150: ...Periodicinspection G 3 1 Periodic maintenance contract 70 90 Type 120 150 190 Type ...
Page 155: ...Water heat exchange unit H 5 3 External view ...
Page 158: ...Water heat exchange unit H 8 4 Specification 2 External dimension diagram ...
Page 161: ...Water heat exchange unit H 11 4 Specification ...